QUESTION NO: 1
In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-based planning only, the planning table is to be used to plan this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material.
Which one of the following reasons for this message applies?
Correct Answer: C
QUESTION NO: 2
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
Correct Answer: C
QUESTION NO: 3
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
Correct Answer: A,D,E
QUESTION NO: 4
A finished material is to be planned in a controlled manner in the SAP ECC system in the context of requirements planning. The planned orders are scheduled using what is known as basic date scheduling (not lead-time scheduling). Which of the following statements is true for the resulting dependent requirements?
Correct Answer: C
QUESTION NO: 5
Which of the following possible errors would lead to the message shown? (Choose two.)
Correct Answer: A,C
QUESTION NO: 6
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two.)
Correct Answer: B,D
QUESTION NO: 7
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)
Correct Answer: A,D,E
QUESTION NO: 8
Which of the following structural elements does a process order have? (Choose three.)