SMRP Certified Maintenance & Reliability Professional - CMRP Exam Questions
QUESTION NO: 1
Total Available Time - (Idle Time + Downtime)
Total Available Time - (Idle Time + Downtime)
Correct Answer: D
QUESTION NO: 2
What practice is outlawed by the Robinson-Patman Act?
What practice is outlawed by the Robinson-Patman Act?
Correct Answer: D
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 3
Total Maintenance Cost per RAV (%) = [Total Maintenance Cost ($) × 100] ÷ Replacement Asset Value ($)
Total Maintenance Cost per RAV (%) = [Total Maintenance Cost ($) × 100] ÷ Replacement Asset Value ($)
Correct Answer: B
QUESTION NO: 4
Measure of the variables inherent in the design that affect availability. In the calculation of downtime, it usually includes only active repair time. It does not include preventive maintenance time and administrative or logistic delays, but does include corrective maintenance downtime
Measure of the variables inherent in the design that affect availability. In the calculation of downtime, it usually includes only active repair time. It does not include preventive maintenance time and administrative or logistic delays, but does include corrective maintenance downtime
Correct Answer: C
QUESTION NO: 5
The metric is the value of maintenance, repair and operating materials (MRO) and spare parts stocked on site to support maintenance, divided by the Replacement Asset Value (RAV) of the assets being maintained at the plant, expressed as a percentage
The metric is the value of maintenance, repair and operating materials (MRO) and spare parts stocked on site to support maintenance, divided by the Replacement Asset Value (RAV) of the assets being maintained at the plant, expressed as a percentage
Correct Answer: C
QUESTION NO: 6
An event when the asset is down and not capable of performing its intended function.
An event when the asset is down and not capable of performing its intended function.
Correct Answer: A
QUESTION NO: 7
Which approaches to costing may use a standard-cost system?
Which approaches to costing may use a standard-cost system?
Correct Answer: B
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 8
the ratio of the benefit to the cost of training maintenance employees
the ratio of the benefit to the cost of training maintenance employees
Correct Answer: C
QUESTION NO: 9
Mesh the production schedule and the maintenance schedule.
Mesh the production schedule and the maintenance schedule.
Correct Answer: C
QUESTION NO: 10
This metric is a measure of equipment or asset performance based on actual utilization time, availability, performance efficiency and quality of product or output over all the hours in the period. TEEP is expressed as a percentage.
This metric is a measure of equipment or asset performance based on actual utilization time, availability, performance efficiency and quality of product or output over all the hours in the period. TEEP is expressed as a percentage.
Correct Answer: D