
IBM Power Systems Scale-Up Technical Sales - C1000-031 Exam Questions
QUESTION NO: 1
Which tool is recommended to assist in the design and deployment of partitions?
Which tool is recommended to assist in the design and deployment of partitions?
Correct Answer: C
QUESTION NO: 2
A customer has used Trial Capacity on Demand on their Power System E980 for two months to test the effect of activating two additional cores and 32GB of additional memory for their SAP LPAR. Being satisfied with the test result, they bought a permanent activation of the two cores and 32GB memory.
They now want to do another short test that requires the activation of one additional core.
Which option provides the most cost-effective solution?
A customer has used Trial Capacity on Demand on their Power System E980 for two months to test the effect of activating two additional cores and 32GB of additional memory for their SAP LPAR. Being satisfied with the test result, they bought a permanent activation of the two cores and 32GB memory.
They now want to do another short test that requires the activation of one additional core.
Which option provides the most cost-effective solution?
Correct Answer: A
QUESTION NO: 3
When using Mobile Activations in Power Enterprise Pools and LPM (Live Partition Mobility) migration, which of the following is true?
When using Mobile Activations in Power Enterprise Pools and LPM (Live Partition Mobility) migration, which of the following is true?
Correct Answer: A
QUESTION NO: 4
A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements.
How many racks units (EIA) are required?
A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements.
How many racks units (EIA) are required?
Correct Answer: C
QUESTION NO: 5
A customer's infrastructure is currently based on a Power System E870 managed by an HMC 7042-CR6 at V8.860 SW level. They are planning to upgrade their server to a new Power System E980.
Which of the following will enable the customer to connect an HMC to the Power System E980?
A customer's infrastructure is currently based on a Power System E870 managed by an HMC 7042-CR6 at V8.860 SW level. They are planning to upgrade their server to a new Power System E980.
Which of the following will enable the customer to connect an HMC to the Power System E980?
Correct Answer: B
QUESTION NO: 6
A Technical Delivery Assessment (TDA), as part of the Solution Assurance is used to:
A Technical Delivery Assessment (TDA), as part of the Solution Assurance is used to:
Correct Answer: A
QUESTION NO: 7
A customer wants to use Live Partition Mobility (LPM) to migrate an AIX 7.1 LPAR from their Power System E980 to some older Power servers in their existing environment.
Assuming their processor mode is set correctly, they can use LPM to move from POWER9 to:
A customer wants to use Live Partition Mobility (LPM) to migrate an AIX 7.1 LPAR from their Power System E980 to some older Power servers in their existing environment.
Assuming their processor mode is set correctly, they can use LPM to move from POWER9 to:
Correct Answer: C
QUESTION NO: 8
A customer has a two node Power System E880 with EXP24S Disk Drawers and I/O Drawers used exclusively for dual VIOS local boot.
How can a Solutions Architect design a POWER9 solution to minimize the physical rack space with an upgrade to a Power System E980?
A customer has a two node Power System E880 with EXP24S Disk Drawers and I/O Drawers used exclusively for dual VIOS local boot.
How can a Solutions Architect design a POWER9 solution to minimize the physical rack space with an upgrade to a Power System E980?
Correct Answer: B




