QUESTION NO: 1
The Timebox to deliver the online reservation system through the Hoy Hall website has experienced a major issue. During Timebox C a test was completed to simulate an attack on the financial element of the online reservation system, with the intention of finding security weaknesses. It was found that it was potentially possible to gain access to the system, its functionality and data. Further work is therefore needed to meet the information security elements of a customer financial transaction.
Answer the following question about the actions to be taken by each role.
Column 1 describes a list of actions related to dealing with the security issue with the hotel reservation system. Column 2 lists the key roles. For each action in Column 1, select from Column 2 the role that should carry out the action.
Each selection from Column 2 can be used once, more than once or not at all.
Column 1
* Advise how the legislation on the transfer of data will affect the requirements and the system.
* Agree the changes needed to the corporate technical architecture with the Architecture Angels IT support team.
* Ensure the information security vulnerability is communicated to the AA Head Office IT Director.
* Evaluate the impact of proposed security controls on the business and decide on the most suitable solution.
* Reprioritise the requirements on the Prioritised Requirements List associated with the security issue.
Column 2
* Project Manager
* Business Sponsor
* Business Visionary
* Technical Coordinator
* Business Analyst
* Team Leader
* Business Ambassador
* Solution Developer


The Timebox to deliver the online reservation system through the Hoy Hall website has experienced a major issue. During Timebox C a test was completed to simulate an attack on the financial element of the online reservation system, with the intention of finding security weaknesses. It was found that it was potentially possible to gain access to the system, its functionality and data. Further work is therefore needed to meet the information security elements of a customer financial transaction.
Answer the following question about the actions to be taken by each role.
Column 1 describes a list of actions related to dealing with the security issue with the hotel reservation system. Column 2 lists the key roles. For each action in Column 1, select from Column 2 the role that should carry out the action.
Each selection from Column 2 can be used once, more than once or not at all.
Column 1
* Advise how the legislation on the transfer of data will affect the requirements and the system.
* Agree the changes needed to the corporate technical architecture with the Architecture Angels IT support team.
* Ensure the information security vulnerability is communicated to the AA Head Office IT Director.
* Evaluate the impact of proposed security controls on the business and decide on the most suitable solution.
* Reprioritise the requirements on the Prioritised Requirements List associated with the security issue.
Column 2
* Project Manager
* Business Sponsor
* Business Visionary
* Technical Coordinator
* Business Analyst
* Team Leader
* Business Ambassador
* Solution Developer


Correct Answer:

Explanation:
* Advise how the legislation on the transfer of data will affect the requirements and the system.
* E. Business Analyst
* Agree the changes needed to the corporate technical architecture with the Architecture Angels IT support team.
* D. Technical Coordinator
* Ensure the information security vulnerability is communicated to the AA Head Office IT Director.
* A. Project Manager
* Evaluate the impact of proposed security controls on the business and decide on the most suitable solution.
* B. Business Sponsor
* Reprioritise the requirements on the Prioritised Requirements List associated with the security issue.
* C. Business Visionary
Rationale:
* A Business Analyst typically has the expertise to understand and communicate how data transfer legislation impacts system requirements.
* The Technical Coordinator is usually responsible for technical decisions, including those that impact the technical architecture, and would work closely with the IT support team to agree on changes.
* The Project Manager should ensure that key information, such as security vulnerabilities, is communicated to senior management, in this case, the IT Director.
* The Business Sponsor, who is ultimately responsible for the project from a business perspective, would evaluate the impact of security measures on the business.
* The Business Visionary is often tasked with understanding the strategic view of the project requirements and would be suited to reprioritize requirements, especially those with significant implications like security issues.
QUESTION NO: 2
As time goes by, there is an increase in Customer Services staff asking questions about how their skills development will be supported under the new structure and how they will influence decisions about the projects they will be assigned to work on.
Which is the MOST appropriate response from the Customer Service Director?
As time goes by, there is an increase in Customer Services staff asking questions about how their skills development will be supported under the new structure and how they will influence decisions about the projects they will be assigned to work on.
Which is the MOST appropriate response from the Customer Service Director?
Correct Answer: C
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 3
The Business Ambassador assigned to the project is only available 2 days a week. The Project Manager has stated that the Investigation stage for each Timebox should, where possible, be planned around the availability of the Business Ambassador.
Is this an appropriate application of the DSDM lifecycle?
The Business Ambassador assigned to the project is only available 2 days a week. The Project Manager has stated that the Investigation stage for each Timebox should, where possible, be planned around the availability of the Business Ambassador.
Is this an appropriate application of the DSDM lifecycle?
Correct Answer: D
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 4
The Change Manager is looking to develop the change agent network that will support the changes related to the Operational delivery processes workstream.
Which information is MOST likely to be relevant for the change agents when being inducted into the change programme for the Operational delivery processes workstream?
The Change Manager is looking to develop the change agent network that will support the changes related to the Operational delivery processes workstream.
Which information is MOST likely to be relevant for the change agents when being inducted into the change programme for the Operational delivery processes workstream?
Correct Answer: A
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 5
Which stakeholder should be placed within the ' primary ' segment?
Which stakeholder should be placed within the ' primary ' segment?
Correct Answer: B
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 6
As Project Increment 4 progresses, the project team must choose the MOST effective communication methods for internal and external stakeholders. The Power/Interest Grid, created in the Foundations phase, is updated as needed when stakeholder influence or interest changes.

For each scenario in Column 1, select the MOST effective communication method from Column 2 to ensure successful outcomes and minimize risk of failure. Each selection in Column 2 can either be used once only or not at all.

As Project Increment 4 progresses, the project team must choose the MOST effective communication methods for internal and external stakeholders. The Power/Interest Grid, created in the Foundations phase, is updated as needed when stakeholder influence or interest changes.

For each scenario in Column 1, select the MOST effective communication method from Column 2 to ensure successful outcomes and minimize risk of failure. Each selection in Column 2 can either be used once only or not at all.

Correct Answer:

Explanation:
The best matching is:
1 # C (Social media)
2 # E (Collaborative workspace)
3 # A (Face-to-face)
4 # D (Email)
5 # B (Instant messaging)
Now the AgilePM reasoning for each:
1. Mira wants to gather interest from potential future guests for a unique aromatherapy oil Best answer: C. Social media This is the most effective option because the audience is potential future guests , who are external stakeholders with relatively low power but useful market influence. Brinda wants market research on likely interest, so the communication method should reach a broad audience efficiently and allow feedback collection at scale.
Why this fits AgilePM:
* AgilePM values timely feedback from stakeholders and users .
* Social media is highly suitable for testing interest, gathering reactions, and validating assumptions quickly.
* It helps support business value decisions before investing further.
Why others are weaker:
* Face-to-face is too limited in reach.
* Email is too narrow and inefficient for market testing.
* Document or collaborative workspace are internal tools, not ideal for external mass engagement.
2. A Guest Experience Team member must collaborate with Priya in India on promotional materials Best answer: E. Collaborative workspace This is the best method because the task involves co-creating content , likely with revisions, comments, versions, and shared visibility across time zones. Since Priya is part-time and there is a 1.5-hour time difference , a collaborative workspace supports both synchronous and asynchronous work.
Why this fits AgilePM:
* AgilePM encourages effective collaboration and visibility of work .
* A collaborative workspace allows both people to:
* edit shared materials,
* review updates,
* track changes,
* reduce version confusion,
* and keep progress transparent.
Why not email:
* Email creates fragmented threads and version-control issues.
* It is not the best tool for iterative collaboration on shared promotional assets.
3. Mira needs Sukra's input on replacing the waterfall with a rainwater purification system; both are on site Best answer: A. Face-to-face This is the strongest choice because the discussion involves technical feasibility, impact, and likely trade- offs , and both people are physically present at the Eco-spa. A face-to-face discussion gives the richest communication and allows rapid clarification.
Why this fits AgilePM:
* AgilePM favors direct communication where possible , especially for complex or potentially ambiguous topics.
* Technical and business conversations benefit from immediate back-and-forth discussion.
* Being on site means they may also inspect the actual area together, which reduces misunderstanding.
Why others are weaker:
* Instant messaging is less rich for a nuanced design/feasibility discussion.
* Email is too slow and formal for a collaborative on-site decision.
* Documenting the outcome may happen later, but the most effective method for the discussion itself is face-to-face.
4. Hira needs Sarah's urgent formal approval to hire a contractor; Sarah is in South America Best answer: D. Email This is the best answer because the communication need is both urgent and formal . Sarah is remote, and Hira needs a clear, traceable approval for hiring a contractor for the next four Sprints.
Why this fits AgilePM:
* AgilePM values communication that is fit for purpose .
* Since this is a sponsor decision with governance and approval implications, email provides:
* a formal record,
* clear wording,
* accountability,
* and easy reference later.
Why not instant messaging:
* Instant messaging may be faster, but it is less suitable for formal approval that may need auditability and clarity.
* For sponsor-level decisions affecting budget/resources, traceability matters.
5. Wanida identifies a health and safety issue on site and must work with Sukra to resolve it Best answer: B. Instant messaging This is the most effective option because the issue is urgent, operational, and time-sensitive . Even if both are on or around the resort, instant messaging enables rapid contact, immediate coordination, and quick sharing of updates while they move between locations.
Why this fits AgilePM:
* AgilePM supports fast, responsive communication when risks or blockers emerge.
* A health and safety issue requires quick coordination to minimize impact and prevent escalation.
* Instant messaging is practical for immediate action, especially on an active site.
Why not face-to-face here:
* Face-to-face is rich, but in this matching set it is better used for the complex solution discussion in scenario 3.
* For scenario 5, the key need is speed of coordination around an urgent site issue.

QUESTION NO: 7
During the Foundations phase for Project Increment 4, Sukra Aroon held a meeting with Hira, Mira Bachar, andWanida Anong, to ensure alignment and compliance with EPR company policies, local regulations, and international standards. The meeting also clarified how financial and investment decisions would be made for Project Increment 4, ensuring alignment with EPR business priorities, and how this information will be tracked, controlled and evidenced.
Wanida Anong, who works across multiple sites worldwide, attended the meeting in person but has limited availability throughout the Project Increment.

(On receiving the meeting invitation, Hira responded suggesting that Brinda Vyas should also be invited to the meeting. Based on AgilePM guidance, which of the following does NOT present an appropriate justification for Brinda Vyas ' attendance?)
During the Foundations phase for Project Increment 4, Sukra Aroon held a meeting with Hira, Mira Bachar, andWanida Anong, to ensure alignment and compliance with EPR company policies, local regulations, and international standards. The meeting also clarified how financial and investment decisions would be made for Project Increment 4, ensuring alignment with EPR business priorities, and how this information will be tracked, controlled and evidenced.
Wanida Anong, who works across multiple sites worldwide, attended the meeting in person but has limited availability throughout the Project Increment.

(On receiving the meeting invitation, Hira responded suggesting that Brinda Vyas should also be invited to the meeting. Based on AgilePM guidance, which of the following does NOT present an appropriate justification for Brinda Vyas ' attendance?)
Correct Answer: B
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 8
Which information could be recorded on an 'empathy map' for the marketing staff?
Which information could be recorded on an 'empathy map' for the marketing staff?
Correct Answer: A
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 9
Which 2 actions should the Business Visionary take to implement the new Must Have requirement?
Which 2 actions should the Business Visionary take to implement the new Must Have requirement?
Correct Answer: D,E
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 10
Midway through Project Increment 4, a joint Sprint Retrospective is held with Developers from both Delivery Teams.
Some members from Marketing and IT, based in India, join via video conferencing.
Issues raised:
. Dependency management challenges
Concerns about AgilePM principle ' Demonstrate Control '
To address this, Mira Bachar and the Developers invite Hira and Sukra Aroon to help Delivery Teams understand the issues, assess the consequences, and collaborate on solutions that align with AgilePM and Scrum.
In addition to the Developers, the teams include:

(Stakeholders have shared concerns about tracking progress. Sarah Lark finds reports inadequate, and Lee Tan dislikes attending meetings.
Which 2 of the following actions would help the Delivery Teams to address these concerns?)
Midway through Project Increment 4, a joint Sprint Retrospective is held with Developers from both Delivery Teams.
Some members from Marketing and IT, based in India, join via video conferencing.
Issues raised:
. Dependency management challenges
Concerns about AgilePM principle ' Demonstrate Control '
To address this, Mira Bachar and the Developers invite Hira and Sukra Aroon to help Delivery Teams understand the issues, assess the consequences, and collaborate on solutions that align with AgilePM and Scrum.
In addition to the Developers, the teams include:

(Stakeholders have shared concerns about tracking progress. Sarah Lark finds reports inadequate, and Lee Tan dislikes attending meetings.
Which 2 of the following actions would help the Delivery Teams to address these concerns?)
Correct Answer: A,B
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 11
Which approach is the MOST likely to ensure that the participants apply themselves productively to the co-design tasks in a workshop?
Which approach is the MOST likely to ensure that the participants apply themselves productively to the co-design tasks in a workshop?
Correct Answer: A
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 12
Sales staff failed to achieve last month's sales targets when training in the mobile products and supporting sales systems and processes was first started. This month the sales team is working after hours and weekends to try to meet the current targets while developing the new skills needed. It is generally felt that this situation is unsustainable.
Which 2 actions by the Sales Director are the MOST appropriate when responding to this type of resistance?
Sales staff failed to achieve last month's sales targets when training in the mobile products and supporting sales systems and processes was first started. This month the sales team is working after hours and weekends to try to meet the current targets while developing the new skills needed. It is generally felt that this situation is unsustainable.
Which 2 actions by the Sales Director are the MOST appropriate when responding to this type of resistance?
Correct Answer: A,B
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 13
Using the project timeline given in the Project Scenario, answer the following question about application of Timeboxing on the Hoy Hall project.
Lines 1 to 5 in the table below consist of an assertion statement and a reason statement. For each line identify the appropriate option, from options A to E, that applies.
Each option can be used once, more than once or not at all.

Assertion :
1. All internal works to be assigned to Timber Tigers throughout the project should be consolidated into one Structured Timebox.
BECAUSE
The Investigation step within each Structured Timebox requires everyone working within the team to jointly agree how the requirements of the Timebox will be met.
2. Acceptance criteria for the front rooms to be developed in Timebox A should be described in detail and agreed during the Timebox Kick-Off BECAUSE The aim of the Investigation step within each Timebox is to complete as much of the development work as possible.
3. It is appropriate that both the Evolutionary Development phase and Deployment phase are shown in the first Project Increment.
BECAUSE
Each Timebox should comprise an Evolutionary Development phase and
Deployment phase.
4. It is appropriate that the outputs of Timebox C are scheduled for deployment at the end of the first Project Increment.
BECAUSE
A typical Timebox Plan should provide a schedule of high-level activities for the imminent Project Increment.
5. It is appropriate that Earth Excavations create a detailed plan of activities they will complete during Timebox C.
Reason
BECAUSE
The Solution Development Team is responsible for planning the detail of all the work of each Timebox.


Using the project timeline given in the Project Scenario, answer the following question about application of Timeboxing on the Hoy Hall project.
Lines 1 to 5 in the table below consist of an assertion statement and a reason statement. For each line identify the appropriate option, from options A to E, that applies.
Each option can be used once, more than once or not at all.

Assertion :
1. All internal works to be assigned to Timber Tigers throughout the project should be consolidated into one Structured Timebox.
BECAUSE
The Investigation step within each Structured Timebox requires everyone working within the team to jointly agree how the requirements of the Timebox will be met.
2. Acceptance criteria for the front rooms to be developed in Timebox A should be described in detail and agreed during the Timebox Kick-Off BECAUSE The aim of the Investigation step within each Timebox is to complete as much of the development work as possible.
3. It is appropriate that both the Evolutionary Development phase and Deployment phase are shown in the first Project Increment.
BECAUSE
Each Timebox should comprise an Evolutionary Development phase and
Deployment phase.
4. It is appropriate that the outputs of Timebox C are scheduled for deployment at the end of the first Project Increment.
BECAUSE
A typical Timebox Plan should provide a schedule of high-level activities for the imminent Project Increment.
5. It is appropriate that Earth Excavations create a detailed plan of activities they will complete during Timebox C.
Reason
BECAUSE
The Solution Development Team is responsible for planning the detail of all the work of each Timebox.


Correct Answer:

Explanation:
For each line, here is the appropriate option from A to E that applies:
* All internal works to be assigned to Timber Tigers throughout the project should be consolidated into one Structured Timebox.
* E. False (Assertion) False (Reason)
* Rationale: It is not practical or in line with Agile principles to consolidate all internal works into one Structured Timebox, as the work will likely need to be spread over multiple Timeboxes.
Additionally, the Investigation step involves agreeing on how to meet the requirements of the Timebox, not necessarily consolidating all work into one.
* Acceptance criteria for the front rooms to be developed in Timebox A should be described in detail and agreed during the Timebox Kick-Off
* B. True (Assertion) True (Reason) BUT the reason does not explain the assertion
* Rationale: While it is true that acceptance criteria should be agreed upon during the Timebox Kick-Off, the reason given is incorrect because the aim of the Investigation step is not necessarily to complete as much development work as possible but to plan and understand the work that will be carried out.
* It is appropriate that both the Evolutionary Development phase and Deployment phase are shown in the first Project Increment.
* A. True (Assertion) True (Reason) AND the reason explains the assertion
* Rationale: Each Timebox should indeed include both Evolutionary Development and a Deployment phase. This assertion and reason correctly align with the concept of Timeboxing in Agile.
* It is appropriate that the outputs of Timebox C are scheduled for deployment at the end of the first Project Increment.
* A. True (Assertion) True (Reason) AND the reason explains the assertion
* Rationale: The typical Timebox Plan does provide a schedule of high-level activities for the imminent Project Increment, which would include planning for deployment.
* It is appropriate that Earth Excavations create a detailed plan of activities they will complete during Timebox C.
* C. True (Assertion) False (Reason)
* Rationale: While it is true that Earth Excavations should create a detailed plan for their activities in Timebox C, the reason is incorrect as the Solution Development Team is not solely responsible for planning all work details within a Timebox. This task would typically be a collaborative effort involving all relevant parties.
QUESTION NO: 14
To ensure that the UniCo change programme is successful, the Chief Executive Officer (CEO) knows that correctly assigning the key change roles will be essential.
Which 2 Sales Team Leaders (TL) are likely to be the line leaders MOST engaged in implementing change, based on the actions that have occurred to date?
To ensure that the UniCo change programme is successful, the Chief Executive Officer (CEO) knows that correctly assigning the key change roles will be essential.
Which 2 Sales Team Leaders (TL) are likely to be the line leaders MOST engaged in implementing change, based on the actions that have occurred to date?
Correct Answer: D,E
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 15
(There were several responses to Brinda Vyas ' suggestion of a tranquil garden for guided meditation. While all valid and valuable, which opinion does NOT align with AgilePM responsibilities?)
(There were several responses to Brinda Vyas ' suggestion of a tranquil garden for guided meditation. While all valid and valuable, which opinion does NOT align with AgilePM responsibilities?)
Correct Answer: B