live chatMcAfee Secure sites help keep you safe from identity theft, credit card fraud, spyware, spam, viruses and online scams
Pass4Test 10%OFF Discount Code

BICSI Registered Communications Distribution Designer - RCDD-001 Exam Questions

QUESTION NO: 1
Which one of the following is part of the security metric to consider in selecting the appropriate labels for
an administrative system?
Correct Answer: E
QUESTION NO: 2
What is the MINIMUM vertical separation between the top rail of a railroad track and telecommunications
facilities placed beneath the track?
Correct Answer: E
QUESTION NO: 3
There are three buildings approximately 400 meters apart and the customer wants to use 10 Gig Ethernet.
What fiber should be specified for this application?
Correct Answer: A
QUESTION NO: 4
The public telephone system is an example of a __________ system.
Correct Answer: D
QUESTION NO: 5
Which of the following is NOT provided by the ac grounding electrode system?
Correct Answer: A
QUESTION NO: 6
You are designing a telecommunications grounding system for a telecommunications room (TR). The
TMGB is located 15 m (50 ft) from the telecommunications rack. What is the MINIMUM AWG of the
ground conductor required?
Correct Answer: A
QUESTION NO: 7
Exhibit:

The following diagram indicates what type of CATV distribution system?
Correct Answer: A
QUESTION NO: 8
Which of the following is NOT a type of intrusion detection system sensor?
Correct Answer: D
QUESTION NO: 9
You have determined that the equipment room (ER) you are designing will be the minimum size of 15 sq
m (160 sq ft) and is servicing 80 but architectural changes will add 175 , which will require you to add a
horizontal cross-connect (HC). What size should the equipment room (ER) be?
Correct Answer: D
QUESTION NO: 10
What are the three typical voltages used in centrally amplified paging systems?
Correct Answer: D
QUESTION NO: 11
When installing underground entrances, no more than ________ 90-degree bends should be included
between pulling points.
Correct Answer: D
QUESTION NO: 12
What is the PERT estimate (in hours) for project design where:
-Optimistic time is 40 hours
-Most likely time is 50 hours
-Pessimistic time is 60 hours
Correct Answer: C
QUESTION NO: 13
You are designing a multi-story dwelling and need to place the CTR's. Every floor is not available. What is
the alternate spacing for the CTRs?
Correct Answer: E
QUESTION NO: 14
When trying to control radio signals from leaking outside of a building, a ______________ antenna should
be used.
Correct Answer: A
QUESTION NO: 15
Which active DAS component is responsible for coupling input signals from donor systems?
Correct Answer: B