Huawei HCIA-LTE-RNP&RNO V1.0 - H35-560 Exam Questions
QUESTION NO: 1
In the case of FTP download or upload (or packet filling) without manual intervention, the throughput rate should be maintained at this time. If there is a sudden drop, call drops may occur.
In the case of FTP download or upload (or packet filling) without manual intervention, the throughput rate should be maintained at this time. If there is a sudden drop, call drops may occur.
Correct Answer: A
QUESTION NO: 2
ASSTTANT is a front-end test tool independently developed by Huawei, which can display test data, replay test data, and export test data.
ASSTTANT is a front-end test tool independently developed by Huawei, which can display test data, replay test data, and export test data.
Correct Answer: B
QUESTION NO: 3
What are the principles that need to be followed when planning LTE neighboring cells? (Multiple choice)
What are the principles that need to be followed when planning LTE neighboring cells? (Multiple choice)
Correct Answer: A,C,D
QUESTION NO: 4
Which physical channel in LTE is used to carry paging messages?
Which physical channel in LTE is used to carry paging messages?
Correct Answer: C
QUESTION NO: 5
The intermodulation interference of the system is usually mainly caused by second-order and third-order intermodulation, and the frequency of the second-order intermodulation product is F=2f1±f2 or 2f2±f1.
The intermodulation interference of the system is usually mainly caused by second-order and third-order intermodulation, and the frequency of the second-order intermodulation product is F=2f1±f2 or 2f2±f1.
Correct Answer: B
QUESTION NO: 6
What is included in the detailed survey of the base station? (multiple choice)
What is included in the detailed survey of the base station? (multiple choice)
Correct Answer: B,C,D,E
QUESTION NO: 7
Regarding TA planning, which of the following statements is incorrect?
Regarding TA planning, which of the following statements is incorrect?
Correct Answer: B
QUESTION NO: 8
The uplink interference problem is judged by checking the RSRP of each cell.
The uplink interference problem is judged by checking the RSRP of each cell.
Correct Answer: B
QUESTION NO: 9
The single-site verification test only needs to verify whether the cell status is normal in the idle mode.
The single-site verification test only needs to verify whether the cell status is normal in the idle mode.
Correct Answer: B