Huawei HCIP-Transmission V2.0 - H31-341 Exam Questions
QUESTION NO: 1
The following description of the operation of the device, the error is:
The following description of the operation of the device, the error is:
Correct Answer: B
QUESTION NO: 2
Which of the following description of the process for optimizing the line attenuation compensation anomaly is correct? (Multiple choice)
Which of the following description of the process for optimizing the line attenuation compensation anomaly is correct? (Multiple choice)
Correct Answer: B,C,D
QUESTION NO: 3
In WDM systems, when using less than () wavelength, it is ideal to use a dielectric thin film filter (TFF).
In WDM systems, when using less than () wavelength, it is ideal to use a dielectric thin film filter (TFF).
Correct Answer: B
QUESTION NO: 4
The maximum optical power of light-emitting OBU output is 20dBm, which is used in the C-band 80 system. How much dBm should the single-wave standard output optical power be?
The maximum optical power of light-emitting OBU output is 20dBm, which is used in the C-band 80 system. How much dBm should the single-wave standard output optical power be?
Correct Answer: B
QUESTION NO: 5
The length range of the DATA field in the Ethernet frame structure is ().
The length range of the DATA field in the Ethernet frame structure is ().
Correct Answer: B
QUESTION NO: 6
The OCh path is created using the single station method. After the creation is completed, the 0ch path is not searched. Which are the possible reasons? (Multiple choice)
The OCh path is created using the single station method. After the creation is completed, the 0ch path is not searched. Which are the possible reasons? (Multiple choice)
Correct Answer: B,D
QUESTION NO: 7
Which of the following are limitations of the alarm and performance analysis methods? (Multiple Choice)
Which of the following are limitations of the alarm and performance analysis methods? (Multiple Choice)
Correct Answer: B,D
QUESTION NO: 8
A, C are the WDM OTM stations, and B is the relay station.
When the transmission direction of the A to B stations is interrupted, the Wavelength side of the B-stack OTU relay board reports the R_LOS emergency alarm and runs the processing to the upstream A.
The station side OTU2_BDI secondary alarm. At the same time, the alarm continues to be transmitted to the downstream station of the B station. After the alarm is processed at the C site, the ODU2_PM_AIS minor alarm is reported on the WDM side of the C-site OTU, and the ODU2_PM_BDI secondary alarm is transmitted back to the upstream station A.
A, C are the WDM OTM stations, and B is the relay station.
When the transmission direction of the A to B stations is interrupted, the Wavelength side of the B-stack OTU relay board reports the R_LOS emergency alarm and runs the processing to the upstream A.
The station side OTU2_BDI secondary alarm. At the same time, the alarm continues to be transmitted to the downstream station of the B station. After the alarm is processed at the C site, the ODU2_PM_AIS minor alarm is reported on the WDM side of the C-site OTU, and the ODU2_PM_BDI secondary alarm is transmitted back to the upstream station A.
Correct Answer: B