
Avaya Communication Server 1000 for Avaya Aura® Implementation - 7003 Exam Questions
QUESTION NO: 1
A customer is installing a new common processor Media Gateway (CPMG) in a
Communication Server (CS) 1000E system. They are connected to the backplane serial port 0 of the MGC to access the configuration menu. No IP information exists for the MGC.
How does the customer access the configuration menu for the MGC?
A customer is installing a new common processor Media Gateway (CPMG) in a
Communication Server (CS) 1000E system. They are connected to the backplane serial port 0 of the MGC to access the configuration menu. No IP information exists for the MGC.
How does the customer access the configuration menu for the MGC?
Correct Answer: D
QUESTION NO: 2
A customer has a Communication Server (CS) 1000 Rls. 7x Co-Resident system with a
Media Gateway Controller and Media Cards and has completed the configuration of all elements and they are all active and known to the Call Server. The customer wants to add all the elements to the Security Domain.
Which Overlay 117 commands used to add the element to the Security Domain?
A customer has a Communication Server (CS) 1000 Rls. 7x Co-Resident system with a
Media Gateway Controller and Media Cards and has completed the configuration of all elements and they are all active and known to the Call Server. The customer wants to add all the elements to the Security Domain.
Which Overlay 117 commands used to add the element to the Security Domain?
Correct Answer: B
QUESTION NO: 3
A customer is preparing to install software on the CPMG server and would like to display the boot sequence on the system terminal for the BIOS, BOOT ROM, and operating
System.
Which port on the CPMG server provides this information?
A customer is preparing to install software on the CPMG server and would like to display the boot sequence on the system terminal for the BIOS, BOOT ROM, and operating
System.
Which port on the CPMG server provides this information?
Correct Answer: B
QUESTION NO: 4
A customer wants to build a new Ip node on their Communication Server (CS) 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application.
What is expected outcome from the system?
A customer wants to build a new Ip node on their Communication Server (CS) 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application.
What is expected outcome from the system?
Correct Answer: A
QUESTION NO: 5
A technician is planning to upgrade a customer's existing Communication Server 1000E Rls. 6.0 system.
During the upgrade, a CPPM server card from storage will be added to provide an additional signaling server.
Which two statements describes what must be done to the CPPM server card to distinguished it as a signaling Server (Choose two)
A technician is planning to upgrade a customer's existing Communication Server 1000E Rls. 6.0 system.
During the upgrade, a CPPM server card from storage will be added to provide an additional signaling server.
Which two statements describes what must be done to the CPPM server card to distinguished it as a signaling Server (Choose two)
Correct Answer: A,B
Explanation: Only visible for Pass4Test members. You can sign-up / login (it's free).
QUESTION NO: 6
A customer is planning to install and configure a Commercial Off the Shelf (COTS) server
IBM X3550 as a Signaling Server for their Communication Server (CS) 1000 Rls.. 7x network.
Which two statements describe the software installation process? (Choose two)
A customer is planning to install and configure a Commercial Off the Shelf (COTS) server
IBM X3550 as a Signaling Server for their Communication Server (CS) 1000 Rls.. 7x network.
Which two statements describe the software installation process? (Choose two)
Correct Answer: A,C
QUESTION NO: 7
A customer with a Communication Server (CS) 1000Rls. 6.0 SA is upgrading to Release 7.0.
They have decided to replace the existing CPPM Call server CPPM Signaling Server with a CPPM Co-Resident Call Server, Signaling Server and Gateway Controller to free up a two card slots. A technician has decided to use the ELAN IP of the Call Server from the original system as the ELAN IP address of the Co-Resident server.
Which action must be taken to consolidate the servers?
A customer with a Communication Server (CS) 1000Rls. 6.0 SA is upgrading to Release 7.0.
They have decided to replace the existing CPPM Call server CPPM Signaling Server with a CPPM Co-Resident Call Server, Signaling Server and Gateway Controller to free up a two card slots. A technician has decided to use the ELAN IP of the Call Server from the original system as the ELAN IP address of the Co-Resident server.
Which action must be taken to consolidate the servers?
Correct Answer: C




