
Cisco Conducting Cisco Unified Wireless Site Survey (CUWSS) v2.0 - 642-732 Exam Questions
QUESTION NO: 1
In evaluating a post-installation WLAN deployment, problems are occurring when a client roams from one AP to another. The client bounces back and forth between APs. Which three items can be checked to resolve this issue? (Choose three.)
In evaluating a post-installation WLAN deployment, problems are occurring when a client roams from one AP to another. The client bounces back and forth between APs. Which three items can be checked to resolve this issue? (Choose three.)
Correct Answer: B,D,F
QUESTION NO: 2
Which two statements best describe the Fresnel zone related to an outdoor RF point-topoint link? (Choose two.)
Which two statements best describe the Fresnel zone related to an outdoor RF point-topoint link? (Choose two.)
Correct Answer: A,C
QUESTION NO: 3
How many location points are needed to validate both 802.11b/g and 802.11a in the Cisco WCS Calibration?
How many location points are needed to validate both 802.11b/g and 802.11a in the Cisco WCS Calibration?
Correct Answer: E
QUESTION NO: 4
Refer to the exhibit.

What is the most likely cause of MAP1 association to MAP2 instead of directly to the RAP?
Refer to the exhibit.

What is the most likely cause of MAP1 association to MAP2 instead of directly to the RAP?
Correct Answer: E
QUESTION NO: 5
Refer to the exhibit. A company requires a multi-point bridge solution with Cisco 1400 series bridges. The central bridge (B1) is set to 10 dBm, the manufacturing remote bridge (B2) is set to 20 dBm, the inventory remote bridge (B3) is set to 20 dBm, and the shop remote bridge (B4) is set to 10 dBm. What is the maximum allowed power setting for all four bridges?

Refer to the exhibit. A company requires a multi-point bridge solution with Cisco 1400 series bridges. The central bridge (B1) is set to 10 dBm, the manufacturing remote bridge (B2) is set to 20 dBm, the inventory remote bridge (B3) is set to 20 dBm, and the shop remote bridge (B4) is set to 10 dBm. What is the maximum allowed power setting for all four bridges?

Correct Answer: A
QUESTION NO: 6
An engineer is conducting a site survey for use of Cisco 7925 wireless clients. Which two design criteria are necessary to ensure proper network design? (Choose two.)
An engineer is conducting a site survey for use of Cisco 7925 wireless clients. Which two design criteria are necessary to ensure proper network design? (Choose two.)
Correct Answer: D,E
QUESTION NO: 7
When performing a post-installation audit using the Ekahau Survey tool, which four steps are associated with the passive portion of the audit? (Choose four.)
When performing a post-installation audit using the Ekahau Survey tool, which four steps are associated with the passive portion of the audit? (Choose four.)
Correct Answer: A,B,D,E
QUESTION NO: 8
Refer to the exhibit. During a post Mesh deployment survey, an engineer notices frame collisions occurring when MAP-1 and MAP-3 talk to RAP-2. Which type of issue is the engineer observing?

Refer to the exhibit. During a post Mesh deployment survey, an engineer notices frame collisions occurring when MAP-1 and MAP-3 talk to RAP-2. Which type of issue is the engineer observing?

Correct Answer: B
QUESTION NO: 9
Which item is more of an issue to outdoor wireless mesh deployment than indoor?
Which item is more of an issue to outdoor wireless mesh deployment than indoor?
Correct Answer: D
QUESTION NO: 10
You have a multinational customer that would like you to perform a wireless site survey for a new manufacturing facility in Singapore. They have had a local vendor install a point-topoint wireless bridge link between two buildings 1 km apart. The ground between the buildings is flat but because facilities are in the mountains, dense fog is an issue. There are no line of sight issues between the buildings. The link is experiencing errors and throughput issues. Currently the two radios are set to operate at 2.4 GHz and the transmit power is set to 7 dBm with 7 dBm antennas. What do you need to take into consideration when performing the site survey for this link?
You have a multinational customer that would like you to perform a wireless site survey for a new manufacturing facility in Singapore. They have had a local vendor install a point-topoint wireless bridge link between two buildings 1 km apart. The ground between the buildings is flat but because facilities are in the mountains, dense fog is an issue. There are no line of sight issues between the buildings. The link is experiencing errors and throughput issues. Currently the two radios are set to operate at 2.4 GHz and the transmit power is set to 7 dBm with 7 dBm antennas. What do you need to take into consideration when performing the site survey for this link?
Correct Answer: A




